翻訳と辞書
Words near each other
・ Canada India Institute-Industry Link Project
・ Canada Industrial Relations Board
・ Canada International Film Festival
・ Canada Jam
・ Canada Jetlines
・ Canada Job Grant
・ Canada Labour Code
・ Canada Land Inventory
・ Canada Lands Company
・ Canada Laughs
・ Canada Learning Bond
・ Canada Lee
・ Canada Life Building
・ Canada Life Building, Montreal
・ Canada Life Financial
Canada Line
・ Canada Live
・ Canada Live (1992 radio program)
・ Canada lunar sample displays
・ Canada lynx
・ Canada Malting Silos
・ Canada Malting Silos, Montreal
・ Canada Marine Act
・ Canada Medal
・ Canada Media Fund
・ Canada Memorial
・ Canada men's junior national softball team
・ Canada men's national ball hockey team
・ Canada men's national basketball team
・ Canada men's national field hockey team


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Canada Line : ウィキペディア英語版
Canada Line

Canada Line is a fully automated rapid transit line in the Metro Vancouver region of British Columbia, Canada. Opened in August 2009, it is the third line in TransLink's SkyTrain metro network, servicing Vancouver, Richmond, and the Vancouver International Airport. It is coloured turquoise on route maps.
The Canada Line comprises of track; the main line goes from Vancouver to Richmond, while a spur line from Bridgeport Station connects to the airport.〔(【引用サイトリンク】title=Frequently Asked Questions )〕 Originally scheduled to open on November 30, 2009, it opened fifteen weeks ahead of schedule, well in advance of the 2010 Winter Olympics the following February.
The Canada Line was anticipated to see 100,000 boardings per day in 2013 and 142,000 boardings per day by 2021, but it has consistently exceeded early targets.〔(Canada Line ) 〕 Ridership has grown steadily since opening day, with average ridership of 83,000 per day in September 2009, 105,000 per day in March 2010,〔(【引用サイトリンク】date=January 20, 2010 )〕 and over 136,000 passengers per weekday in June 2011. During the 17 days of the 2010 Winter Olympics, the line carried an average of 228,190 passengers per day.〔(【引用サイトリンク】title=TransLink carried 26 million passengers during Games )
Governance of the project was through Canada Line Rapid Transit Inc. (CLCO), formerly RAV Project Management Ltd. (RAVCO, a reflection of the original "Richmond-Airport-Vancouver" name). The line was built by SNC-Lavalin, and InTransitBC will manage the line for 35 years under a contract with TransLink. The Canada Line is operationally independent from British Columbia Rapid Transit Company, which operates SkyTrain's Expo and Millennium lines,〔(【引用サイトリンク】title=Frequently Asked Questions, Canada Line )〕 but is considered a part of the SkyTrain network. Like the other two SkyTrain lines in Metro Vancouver, it is also light metro rapid transit, using fully automated trains on grade-separated guideways.〔(【引用サイトリンク】title=Making the Connection to a World of Choice )
==Route==

The Canada Line begins in Downtown Vancouver at Waterfront Station (0.0 km) in a cut-and-cover subway tunnel beneath Granville Street. It quickly transitions into twin bored tunnels, heading southwest beneath Granville Street, then curving southeast to follow Davie Street through Yaletown. The tunnels then dive deeper to pass below False Creek before rising back up to Olympic Village Station (2.7 km). There, the line transitions back to a cut-and-cover tunnel (which is noted by the tunnel changing from a circular to a square shape) heading south under Cambie Street, some portions of which have the two sets of tracks stacked vertically. The line emerges from the ground just south of 64th Avenue, climbing to an elevated guideway.〔(【引用サイトリンク】url=http://www.canadaline.ca/aboutOverview.asp )
The line continues elevated across the North Arm Bridge over the North Arm of the Fraser River, leaving Vancouver and entering Richmond. Just beyond Bridgeport Station (11.1 km), the line splits, with the Richmond branch heading south on elevated tracks along No. 3 Road and terminating at Richmond–Brighouse Station (14.5 km). The airport branch turns west and crosses the Middle Arm Bridge over the Middle Arm of the Fraser River, connecting to stations on Sea Island and terminating at YVR–Airport Station (15.0 km). Portions of the airport branch are at grade in order to accommodate a future elevated taxiway for aircraft over the line. Both branches narrow to a single track as they approach their respective terminus stations. Just before Bridgeport Station is the OMC (Operations and Maintenance Centre) facility, which houses the trains when not in use.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Canada Line」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.